1 MW Hydro operating in Ventura, CA — California Independent System Operator
1 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1994
Operating Since
Coordinates
34.2253, -119.0858
County
Ventura, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Calleguas Mun Water District | — | — |
| Owner(s) | Calleguas Mun Water District | — | — |
| Status | Operating | — | — |
Springville Hydroelectric is a 1 MW conventional hydroelectric power plant located in Ventura County, California. The plant began operating in 1994 and is owned and operated by Calleguas Municipal Water District. It utilizes water (WAT) as its primary fuel source and consists of a single generator.
In the most recent year of reported data, Springville Hydroelectric generated 98 MWh of electricity, resulting in a capacity factor of 1.1%. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Based on its generating capacity, Springville Hydroelectric ranks as the 247th largest power plant in California out of 247 plants, and 1440th nationally out of 1464 plants.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
16 kV
Regulatory Status
NR
Entity Type
Municipal
Sector
IPP Non-CHP
9 MWh
Latest Month
98 MWh
Annual Generation
1.1%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Colonia Substation · 66 kV
Substation Distance
0 km
Operator
Southern California Edison
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
SCLARA_6_N027
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match