2.4 MW Landfill Gas operating in Green Lake, WI — Midcontinent Independent Transmission System Operator, Inc..
2.4 MW
Nameplate Capacity
3
Generators
units
Landfill Gas
Technology
2001
Operating Since
Coordinates
43.9603, -88.9158
County
Green Lake, WI
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | WM Renewable Energy LLC | WM Renewable Energy | — |
| Owner(s) | WM Renewable Energy LLC | Waste Management | — |
| Status | Operating | — | — |
Berlin Landfill Gas is a 2.4 MW landfill gas-fueled power plant located in Green Lake County, Wisconsin. The plant began operating in 2001 and is owned by Waste Management, with WM Renewable Energy LLC listed as the operator. It consists of three generators utilizing landfill gas as its primary fuel source. The plant is interconnected to the Midcontinent Independent Transmission System Operator (MISO) balancing authority.
In the most recent year of reported data, Berlin Landfill Gas generated 13,612 MWh of electricity, achieving a capacity factor of 64.6%. The plant is ranked as the 10th largest of 12 landfill gas plants in Wisconsin, and 232nd out of 284 such plants nationally. The plant operates within the MRO NERC region.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
12.5 kV
Regulatory Status
NR
Entity Type
Industrial
Sector
IPP Non-CHP
1.1K MWh
Latest Month
13.6K MWh
Annual Generation
64.6%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Berlin · 69 kV
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
Zonal
Pricing Hub
MICHIGAN.HUB
Node Source
EIA-860 direct report