1.9 MW Wind operating in Lincoln, MN — Midcontinent Independent Transmission System Operator, Inc..
1.9 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2001
Operating Since
Coordinates
44.4200, -96.4347
County
Lincoln, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | CHI Operations Inc | — | — |
| Owner(s) | Enel North America, Inc. | — | — |
| Status | Operating | — | — |
Tsar Nicholas LLC is a 1.9 MW wind power plant located in Lincoln County, Minnesota. The plant began operating in 2001 and utilizes a single onshore wind turbine generator. CHI Operations Inc. is the plant's operator.
The plant's latest annual electricity generation was 3,717 MWh, achieving a capacity factor of 22.3%. Tsar Nicholas LLC is interconnected to the Midcontinent Independent Transmission System Operator (MISO) balancing authority and is situated within the MRO NERC region. In terms of size, the plant ranks 94th out of 123 power plants in Minnesota and 1321st out of 1424 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
34.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
250 MWh
Latest Month
3.7K MWh
Annual Generation
22.3%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
NSP.BUFFR_TR1
Pricing Hub
MINN.HUB
Location Type
Generation Node
Node Source
Curated node match