702.1 MW Natural Gas operating in Shelby, IL — Midcontinent Independent Transmission System Operator, Inc..
702.1 MW
Nameplate Capacity
3
Generators
units
Natural Gas Fired Combined Cycle
Technology
2002
Operating Since
Coordinates
39.2238, -88.7595
County
Shelby, IL
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | NAES Corporation - (WA) | Holland Energy | — |
| Owner(s) | Holland Energy LLC | Wabash Valley Power Association | — |
| Status | Operating | — | — |
The Holland Energy Facility, located in Shelby County, Illinois, is a 702.1 MW natural gas-fired combined cycle power plant. It began operating in 2002 and consists of 3 generators. The plant is owned by Wabash Valley Power Association, with NAES Corporation - (WA) serving as the operator.
Holland Energy Facility operates within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the SERC NERC region. In the most recent year of data, the plant generated 1,619,289 MWh of electricity, achieving a capacity factor of 26.3%. It is ranked as the 8th largest power plant out of 32 in Illinois, and 308th out of 945 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
345 kV
Regulatory Status
RE
Entity Type
Cooperative
Sector
Electric Utility
304.3K MWh
Latest Month
1.6M MWh
Annual Generation
26.3%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
AMIL.CSTN3
Pricing Hub
ILLINOIS.HUB
Location Type
Generation Node
Node Source
EIA-860 direct report
Illinois Legislators Introduce Power Act, Which Would Force Data Centers To Foot Energy Costs
Illinois state legislators are proposing the Power Act, which would put guardrails around the rapid expansion of large-scale data centers.
Holtec Submits License Application to NRC for the Palisades Twin SMR-300s
Holtec Submits License Application to NRC for the Palisades Twin SMR-300s Palisades Reactor Restart Delayed to 2026 Illinois Gov Pritzker...
Read "Electricity from Renewable Resources: Status, Prospects, and Impediments" at NAP.edu
Read chapter 5 Environmental Impacts of Renewable Electricity Generation: A component in the America's Energy Future study, Electricity from Renewable Res.
Consumers Energy says operating Campbell Plant through September cost $80M
Consumers has previously stated intentions for "cost recovery" in relation to operating the J.H. Campbell Plant in Port Sheldon Township...
Last updated 2026-03-14
View all 10 articles