46.8 MW Wind operating in Kern, CA — California Independent System Operator
46.8 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
1994
Operating Since
Coordinates
35.0740, -118.3153
County
Kern, CA
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Terra-Gen Operating Co-Wind | Terra-Gen | — |
| Owner(s) | Ridgetop Energy LLC II | Terra-Gen [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Terra-Gen [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
The Ridgetop wind power plant is located in Kern County, California. The plant has a total capacity of 46.8 MW and began operating in 1994. It utilizes onshore wind turbine technology and is owned and operated by Terra-Gen Operating Co-Wind. Ridgetop is connected to the California Independent System Operator (CAISO) balancing authority and is within the Western Electricity Coordinating Council (WECC) NERC region.
Ridgetop's latest annual generation was 145,880 MWh, resulting in a capacity factor of 35.4%. The plant is ranked 50th out of 116 wind plants in California and 954th out of 1424 wind plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
66.6 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
9.8K MWh
Latest Month
145.9K MWh
Annual Generation
35.4%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
CORAMA_7_N003
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
Jesse Colin Young, Singer Who Urged Us to ‘Get Together,’ Dies at 83
As the leader of the Youngbloods, he sang an enduring anthem of the peace-and-love era, with the chorus, “Come on people now, smile on your...
OP-ED: Wiyot Tribe Urges People to Cast a Wary Eye on Ridgetop Wind Power Project, Submit Comments on its Environmental Impact Report
If you haven't already heard, another out-of-town developer, Terra-Gen, wants to install up to sixty (60), 600- foot tall wind turbines on...
Last updated 2026-03-14
View all articles