44.3 MW Batteries (14 MW) + Conventional Hydroelectric (30 MW) operating in Coos, NH — ISO New England Inc.
44.3 MW
Nameplate Capacity
22
Generators
units
Hybrid (2)
Technology
Batteries + Conventional Hydroelectric
1914
Operating Since
Coordinates
44.3889, -71.1645
County
Coos, NH
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Great Lakes Hydro America LLC | — | — |
| Owner(s) | Great Lakes Hydro America LLC | — | — |
| Status | Operating | — | — |
The Berlin Gorham power plant is located in Coos County, New Hampshire. The facility, which began operating in 1914, has a total capacity of 44.3 MW across 22 generators and is owned and operated by Great Lakes Hydro America LLC. The plant is a hybrid facility utilizing both conventional hydroelectric generation and battery storage. The primary fuel source is water (WAT). Berlin Gorham ranks 3rd out of 32 power plants in New Hampshire and 324th out of 1464 plants nationally.
The plant includes a battery energy storage system (BESS) with a capacity of 14 MWh and a duration of 1 hour, utilizing lithium-ion battery chemistry (LIB). The latest annual generation data indicates an output of 133,480 MWh, resulting in a capacity factor of 34.3%. Berlin Gorham operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
22 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
9.5K MWh
Latest Month
133.5K MWh
Annual Generation
34.3%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.Z.NEWHAMPSHIRE
Node Source
OSM spatial match
New Boiler Prepares White Mountain Paper Co. for Growth
A massively sized new boiler, one that provides the steam to operate the paper machine, is now operating in the 19th-century plant.
City hopeful Burgess BioPower continues to operate as court OKs reorganization plan
BERLIN — Sixteen months after Burgess BioPower filed for Chapter 11 bankruptcy, U.S. Bankruptcy Judge Laurie Selber Silverstein has approved...
City hopeful Burgess BioPower continues to operate as court OKs reorganization plan
BERLIN — Sixteen months after Burgess BioPower filed for Chapter 11 bankruptcy, U.S. Bankruptcy Judge Laurie Selber Silverstein has approved...
Work to Build Landfill-to-Gas Plant to Begin in Late Summer
Northern Biogas official Robert McHale (standing) speaks about a plan to convert raw gas generated by the Mount Carberry landfill to clean...