1.6 MW Hydro out of service in Herkimer, NY — New York Independent System Operator
1.6 MW
Nameplate Capacity
4
Generators
units
Conventional Hydroelectric
Technology
1987
Operating Since
Coordinates
43.0336, -74.9834
County
Herkimer, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | ECOsponsible LLC | — | — |
| Owner(s) | ECOsponsible LLC | — | — |
| Status | Out of service | — | — |
The Herkimer hydroelectric plant is located in Herkimer County, New York. The plant has a total capacity of 1.6 MW across four generators. It began operating in 1987 and is owned and operated by ECOsponsible LLC. The primary fuel source for the plant is water (WAT), and its technology is classified as conventional hydroelectric.
The Herkimer plant operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In terms of size, the plant ranks 144th out of 165 power plants in New York state, and 1284th out of 1464 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
New York Independent System Operator
Grid Voltage
46.3 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
INDECK___ILION
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone E
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
Concerns Over Lithium-ion Battery Fires
Residents in Herkimer County have concerns over a proposed solar farm in the wake of another lithium-ion battery fire that took place in...
Concerns Over Lithium-ion Battery Fires
Residents in Herkimer County have concerns over a proposed solar farm in the wake of another lithium-ion battery fire that took place in...
Concerns Over Lithium-ion Battery Fires
Residents in Herkimer County have concerns over a proposed solar farm in the wake of another lithium-ion battery fire that took place in...
PILOT approved for solar project
HERKIMER — The Herkimer County Industrial Development Agency voted Tuesday to approve an inducement resolution for a proposed solar project...
Last updated 2026-03-26
View all articles