70 MW Bit. Coal operating in Manistee, MI — Midcontinent Independent Transmission System Operator, Inc..
70 MW
Nameplate Capacity
1
Generators
unit
Conventional Steam Coal
Technology
1990
Operating Since
Coordinates
44.2182, -86.2901
County
Manistee, MI
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | TES Filer City Station LP | — | — |
| Owner(s) | CMS Generation Filer City Inc, KCR Power Co LLC, Louisiana Iron Works Inc, Western Michigan Cogeneration LP | — | — |
| Status | Operating | — | — |
TES Filer City Station is a 70 MW coal-fired power plant located in Manistee County, Michigan. The plant began operating in 1990 and has one generator utilizing conventional steam coal technology. It is owned and operated by TES Filer City Station LP. The plant is connected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and is situated within the ReliabilityFirst Corporation (RFC) NERC region.
In the most recent year with available data, the plant generated 351,278 MWh of electricity, achieving a capacity factor of 57.2%. Among coal plants in Michigan, TES Filer City Station holds a rank of 1 out of 3. Nationally, it is ranked 53 out of 60 among similar facilities.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP CHP
35.7K MWh
Latest Month
351.3K MWh
Annual Generation
57.2%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Filer City · 138 kV
Substation Distance
< 10 km
Operator
ITC
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
cons.filercity
Pricing Hub
MICHIGAN.HUB
Node Source
EIA-860 direct report
Michigan lawmakers propose state-run carbon capture, sequestration permitting program
A state-run program would pave the way for more aggressive adoption of the technology, supporters said.
Firms eye northern Michigan for carbon capture project. Others are wary
Michigan is preparing to ask the EPA for oversight authority of carbon sequestration wells, which companies are eyeing projects in the...
Tondu plant converting to $300M biomass, carbon capture facility
TES Filer City power plant is set to make a $300M change to biomass fuel, capturing 550000 tons of carbon dioxide annually in Manistee...
Tondu plant converting to $300M biomass, carbon capture facility
TES Filer City power plant is set to make a $300M change to biomass fuel, capturing 550000 tons of carbon dioxide annually in Manistee...
Last updated 2026-03-26
View all 10 articles