2.5 MW Hydro out of service in Lake, CA — California Independent System Operator
2.5 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1985
Operating Since
Coordinates
38.9236, -122.5667
County
Lake, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Yolo County Flood Control WCD | — | — |
| Owner(s) | Yolo County Flood Control WCD | — | — |
| Status | Out of service | — | — |
The Clear Lake Hydro Project is a 2.5 MW hydroelectric power plant located in Lake County, California. The plant began operating in 1985 and has a single generator utilizing conventional hydroelectric technology. The primary fuel source is water (WAT). The plant is owned and operated by Yolo County Flood Control & Water Conservation District.
The Clear Lake Hydro Project operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, the plant is ranked 211 out of 247 power plants in California and 1141 out of 1464 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
115 kV
Regulatory Status
NR
Entity Type
Political Subdivision
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
HIGHLD_1_N004
Pricing Hub
TH_NP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match