80 MW Natural Gas operating in Wichita, TX — Electric Reliability Council of Texas, Inc.
80 MW
Nameplate Capacity
4
Generators
units
Natural Gas Fired Combined Cycle
Technology
1987
Operating Since
Coordinates
33.8629, -98.5896
County
Wichita, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Signal Hill Generating LLC | Signal Hill Generating | — |
| Owner(s) | Signal Hill Generating LLC | Energy Trading Innovations | — |
| Status | Operating | — | — |
Signal Hill Generating LLC is an 80 MW natural gas-fired combined cycle power plant located in Wichita County, Texas. The plant began operating in 1987 and consists of 4 generators. It is owned and operated by Signal Hill Generating LLC, a subsidiary of Energy Trading Innovations. The plant's location places it within the Electric Reliability Council of Texas (ERCOT) balancing authority.
In the most recent year with available data, Signal Hill Generating LLC produced 1,987 MWh of electricity, resulting in a capacity factor of 0.3%. The plant ranks 151st out of 312 power plants in Texas and 1004th out of 1963 plants nationally. The plant's operation has been mentioned in two news articles, one regarding hazards and one concerning regulatory matters.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
140 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
0 MWh
Latest Month
2.0K MWh
Annual Generation
0.3%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
ERCOT
LMP Node
WFCOGEN_CC1
Pricing Hub
HB_NORTH
Location Type
Resource Node
Node Source
EIA-860 direct report
Red Flag Warning: Grant; Kay; Garfield; Noble; Blaine; Kingfisher; Logan; Payne; Caddo; Canadian; Oklahoma; Lincoln; G
Red Flag Warning issued March 21 at 12:09PM CDT until March 22 at 9:00PM CDT by NWS Norman OK
NERC Case Notes: Reliability Standard FAC-008-3
American Electric Power Service Corporation (AEP), FERC Docket No. NP18-6 (January 31, 2018). Reliability Standard: FAC-008-3. Requirement: R6.
Last updated 2026-03-21