1.7 MW Hydro operating in Franklin, NY — New York Independent System Operator
1.7 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1988
Operating Since
Coordinates
44.9099, -74.0858
County
Franklin, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Hydroland Omega LLC | — | — |
| Owner(s) | Hydroland Omega LLC | — | — |
| Status | Operating | — | — |
Chateaugay High Falls Hydro is a hydroelectric power plant located in Franklin County, New York. The plant has a total capacity of 1.7 MW and utilizes a single generator. It commenced operations in 1988 and is owned and operated by Hydroland Omega LLC. The primary fuel source for the plant is water (WAT), and its technology is classified as conventional hydroelectric.
In the most recent year with available data, Chateaugay High Falls Hydro generated 2,757 MWh of electricity, resulting in a capacity factor of 18.5%. The plant operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In terms of size, Chateaugay High Falls Hydro ranks 141st out of 165 power plants in New York and 1270th out of 1464 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
New York Independent System Operator
Grid Voltage
34.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
181 MWh
Latest Month
2.8K MWh
Annual Generation
18.5%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
CHAT_HIGH_FALL_HYD
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone D
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.