50 MW Hydro operating in Pierce, WA — City of Tacoma, Department of Public Utilities, Light Division
50 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1945
Operating Since
Coordinates
46.8016, -122.3102
County
Pierce, WA
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Tacoma - (WA) | City of Tacoma (WA) | — |
| Owner(s) | City of Tacoma - (WA) | City of Tacoma (WA) | — |
| Status | Operating | operating | — |
GEM identifies the owner as City of Tacoma (WA)
This entity is not yet in the GEM ownership database — chain unavailable.
Alder Dam is a concrete thick arch dam on the Nisqually River in the U.S. state of Washington. The construction began in 1942 and was completed in 1945. At this time Alder Dam was among the tallest dams in the United States, although this title has since been surpassed. The impounded water behind the dam forms Alder Lake, stretching about 7 miles (11 km) upstream with a capacity of 241,950 acre-feet (0.29844 km3). With 28 miles (45 km) of shoreline, the lake is a popular recreation spot close to Mount Rainier National Park.
Read more on WikipediaThe Alder hydroelectric plant, located in Pierce County, Washington, has a total capacity of 50 MW. The plant began operating in 1945 and utilizes conventional hydroelectric technology. It is owned and operated by the City of Tacoma, Washington. Alder is ranked as the 32nd largest power plant in Washington out of 75, and 302nd nationally out of 1464 plants.
The plant consists of two generators and uses water as its primary fuel source. In the most recent year with available data, Alder generated 182,852 MWh of electricity, achieving a capacity factor of 41.6%. The balancing authority for the plant is the City of Tacoma, Department of Public Utilities, Light Division, and it operates within the Western Electricity Coordinating Council (WECC) NERC region.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
City of Tacoma, Department of Public Utilities, Light Division
Grid Voltage
110 kV
Regulatory Status
RE
Entity Type
Municipal
Sector
Electric Utility
24.2K MWh
Latest Month
182.9K MWh
Annual Generation
41.6%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
Eight Skiers Confirmed Dead in California Avalanche, One Still Missing
At least eight skiers died in an avalanche in California's Sierra Nevada mountains, and a ninth is presumed dead, authorities said on...
9 Alder Place, Morley, WA 6062
4 bedroom house for sale at 9 Alder Place, Morley, WA 6062, UNDER OFFER. View 29 property photos, floor plans and Morley suburb information.
English Station Rezoning Hearing Delayed
An Elicker administration proposal to rezone the former English Station power plant site from a heavy industrial to a park district wound up...
Dawn Zimmer takes over as permanent Energy CIO
The move to install Zimmer comes after a high turnover rate in the department's top IT post under the Trump administration. By Madison Alder.
Last updated 2026-03-26
View all 10 articles