3.8 MW Hydro operating in Weber, UT — PacifiCorp - East
3.8 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1911
Operating Since
Coordinates
41.1376, -111.8850
County
Weber, UT
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | PacifiCorp | PacifiCorp | — |
| Owner(s) | PacifiCorp | Berkshire Hathaway | — |
| Status | Operating | — | — |
The Weber hydroelectric plant is located in Weber County, Utah. The plant has a total capacity of 3.8 MW and began operating in 1911, making it one of the oldest operating power plants in the state. It consists of a single generator utilizing conventional hydroelectric technology. The primary fuel source is water (WAT). PacifiCorp, a subsidiary of Berkshire Hathaway, operates the facility.
Weber operates within the PacifiCorp - East balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. The plant's installed cost was $945.07 per kW. The plant has a power purchase agreement (PPA) price of $10.78 per MWh. Weber ranks as the 12th largest power plant out of 30 in Utah, and 986th out of 1464 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
PacifiCorp - East
Grid Voltage
46 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
$10.8/MWh
PPA Price
PacifiCorp
Contract Seller
Cumulative Installed Cost
Per-Unit Cost Trends
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.