623 MW Natural Gas operating in Bastrop, TX — Electric Reliability Council of Texas, Inc.
623 MW
Nameplate Capacity
3
Generators
units
Natural Gas Steam Turbine
Technology
1965
Operating Since
Coordinates
30.1456, -97.2708
County
Bastrop, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Lower Colorado River Authority | Lower Colorado River Authority | — |
| Owner(s) | Lower Colorado River Authority | Lower Colorado River Authority | — |
| Status | Operating | — | — |
The Sim Gideon Power Plant is a 639 megawatt (MW), natural gas fired power plant located near Bastrop, Texas in Bastrop County, Texas. It is owned and operated by the Lower Colorado River Authority. The Sim Gideon Power Plant consists of three generating units that operate via natural gas-fired boilers. The plant, along with Lost Pines Power Project 1, is part of the Lost Pines Power Park.
Read more on WikipediaThe Sim Gideon Power Plant is a 623 MW natural gas-fired power plant located in Bastrop County, Texas. The plant began operating in 1965 and consists of three natural gas steam turbine generators. It is owned and operated by the Lower Colorado River Authority (LCRA). The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, and is within the Texas Reliability Entity (TRE) NERC region.
In the most recent year with available data, Sim Gideon generated 1,043,148 MWh of electricity, achieving a capacity factor of 19.0%. Sim Gideon is ranked as the 57th largest power plant in Texas out of 144, and 377th nationally out of 945 plants.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
RE
Entity Type
Political Subdivision
Sector
Electric Utility
31.1K MWh
Latest Month
1.0M MWh
Annual Generation
19.0%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Sim Gideon Station · 138 kV
Substation Distance
0 km
Operator
Lower Colorado River Authority
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
GID_GIDEONG1
Pricing Hub
HB_SOUTH
Secondary Zone
LZ_SOUTH
Location Type
Resource Node
Node Source
Curated node match
Bluebonnet Electric Co-Op to build new headquarters
Bluebonnet Electric Cooperative is planning to build a new headquarters facility on a 452-acre campus near Bastrop, moving it from Giddings.
LCRA fined for permit lapse at Bastrop power plant
The Lower Colorado River Authority was slapped with a hefty fine last week after its power plant in Bastrop operated for 17 months without a required pollution...
Ensuring the Cybersecurity of Plant Industrial Control Systems
Industrial control systems (ICSs) manage global industrial infrastructures, including electric power systems, by measuring, controlling,...
Wireless technologies connect two LCRA plants
The site hosts two separate facilities that provide distinctly different services to the Electric Reliability Council of Texas (ERCOT) generation market.
Last updated 2026-03-14