4155.6 MW Conventional Steam Coal (2600 MW) + Natural Gas Fired Combined Cycle (1556 MW) operating in Stewart, TN — Tennessee Valley Authority
4,155.6 MW
Nameplate Capacity
6
Generators
units
Hybrid (2)
Technology
Conventional Steam Coal + Natural Gas Fired Combined Cycle
1973
Operating Since
Coordinates
36.3903, -87.6539
County
Stewart, TN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Tennessee Valley Authority | Tennessee Valley Authority | — |
| Owner(s) | Tennessee Valley Authority | Tennessee Valley Authority | — |
| Status | Operating | — | — |
Cumberland Fossil Plant is a pulverized coal-fired power station located west of Cumberland City, Tennessee, US, on the south bank of Lake Barkley on the Cumberland River. Owned and operated by Tennessee Valley Authority (TVA), it has a gross capacity of 2,470 MW, and is the most powerful power station in Tennessee.
Read more on WikipediaThe Cumberland power plant, located in Stewart County, Tennessee, is owned and operated by the Tennessee Valley Authority (TVA). Commissioned in 1973, the plant has a total capacity of 4155.6 MW across 6 generators, making it the largest power plant in Tennessee and the third-largest in the United States. The plant is a hybrid facility utilizing both conventional steam coal and natural gas-fired combined cycle technologies. Its primary fuel source is natural gas (NG).
In the latest year for which data is available, the Cumberland plant generated 9,096,100 MWh of electricity, operating at a capacity factor of 24.8%. The plant operates within the Tennessee Valley Authority balancing authority area and is located within the SERC Reliability Corporation NERC region.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Tennessee Valley Authority
Grid Voltage
161 kV
Regulatory Status
RE
Entity Type
Federal
Sector
Electric Utility
792.6K MWh
Latest Month
9.1M MWh
Annual Generation
24.8%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
5 takeaways on TVA’s future under Trump from Senate hearing
President Donald Trump's nominees to the Tennessee Valley Authority board committed to keeping the utility public in a Senate hearing but...
5 takeaways on TVA’s future under Trump from Senate hearing
President Donald Trump's nominees to the Tennessee Valley Authority board committed to keeping the utility public in a Senate hearing but...
Trump TVA nominees each say ‘no’ to privatizing federal utility
President Donald Trump's nominees to the Tennessee Valley Authority board of directors committed to keeping the nation's largest public...
March 14-15, 2025 Severe Weather Outbreak and Flooding
On Saturday, March 15th, 2025, a line of showers and thunderstorms moved through Middle TN. As the north-south line of storms crossed over US Hwy 41A, it...
Last updated 2026-03-26
View all 10 articles