2.3 MW Hydro out of service in Tulare, CA — California Independent System Operator
2.3 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1929
Operating Since
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Southern California Edison Co | Southern California Edison | — |
| Owner(s) | Southern California Edison Co | Edison International | — |
| Status | Out of service | — | — |
Kaweah 1 is a hydroelectric power plant located in Tulare County, California. The plant has a total capacity of 2.3 MW and began operating in 1929. It utilizes conventional hydroelectric technology and is fueled by water (WAT). The plant has one generator. Kaweah 1 is owned by Edison International and operated by Southern California Edison Co.
The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Kaweah 1's installed cost was $10,003.23 per kW, according to FERC data. The plant ranks 213th out of 247 power plants in California and 1173rd out of 1464 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
66 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
$12,291/kW
Installed Cost
Southern California Edison Company
Reporting Utility
Cumulative Installed Cost
Per-Unit Cost Trends
Point of Interconnection
Nearest Substation
Kaweah 1 Substation · 66 kV
Substation Distance
< 10 km
Operator
Southern California Edison
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_ZP26_GEN-APND
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
California utility SCE seeks expedited approval for solar-plus-storage offtake contracts
Southern California Edison (SCE) is seeking expedited CPUC approval for offtake contracts related to Copia Power's Centennial Flats project.
California utility SCE seeks expedited approval for solar-plus-storage offtake contracts
Southern California Edison (SCE) is seeking expedited CPUC approval for offtake contracts related to Copia Power's Centennial Flats project.
California utility SCE seeks expedited approval for solar-plus-storage offtake contracts
Southern California Edison (SCE) is seeking expedited CPUC approval for offtake contracts related to Copia Power's Centennial Flats project.
California utility SCE seeks expedited approval for solar-plus-storage offtake contracts
Southern California Edison (SCE) is seeking expedited CPUC approval for offtake contracts related to Copia Power's Centennial Flats project.
Last updated 2026-03-26
View all 10 articles