8.5 MW Hydro out of service in Monroe, NY — New York Independent System Operator
8.5 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1960
Operating Since
Coordinates
43.1611, -77.6150
County
Monroe, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Rochester Gas & Electric Corp | Rochester Gas & Electric | — |
| Owner(s) | Rochester Gas & Electric Corp | Avangrid | — |
| Status | Out of service | — | — |
Rochester 2 is a hydroelectric power plant located in Monroe County, New York. The plant has a total capacity of 8.5 MW and began operating in 1960. It is owned by Avangrid and operated by Rochester Gas & Electric Corp. The plant utilizes conventional hydroelectric technology and its primary fuel source is water (WAT). Rochester 2 is part of the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
Rochester 2 is the 48th largest power plant in New York out of 165, and the 712th largest in the United States out of 1464. Financial data indicates an installed cost of $2216.08 per kW, according to FERC data. The plant has one generator.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
New York Independent System Operator
Grid Voltage
11.5 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
$2,314/kW
Installed Cost
Rochester Gas and Electric Corporation
Reporting Utility
Cumulative Installed Cost
Per-Unit Cost Trends
Point of Interconnection
Nearest Substation
STATION 5_MISC_HYD
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
23604
Pricing Hub
NYISO Zone B
Node Source
EIA-860 direct report
Seeing double the solar installations in Oregon | Projects Weekly
Avangrid has energized two solar projects in Wasco County, Oregon, totaling 200 MWac. Plus, Zelestra has expanded its relationship with Meta...
Avangrid switches on 57 MW Camino Solar in California | Projects Weekly
In this edition of Projects Weekly, we highlight Avangrid's newest project in California, plus all the latest solar project news you missed.
Avangrid switches on 57 MW Camino Solar in California | Projects Weekly
In this edition of Projects Weekly, we highlight Avangrid's newest project in California, plus all the latest solar project news you missed.
Avangrid Signs Blue Creek Power Deal with American Municipal Power
Avangrid signed a short-term power purchase agreement with American Municipal Power for a portion of the energy produced from the Blue Creek...
Last updated 2026-03-26
View all 10 articles