52.4 MW Distillate Oil standby in Suffolk, NY — New York Independent System Operator
52.4 MW
Nameplate Capacity
1
Generators
unit
Petroleum Liquids
Technology
1971
Operating Since
Coordinates
40.6955, -73.3486
County
Suffolk, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | National Grid Generation LLC | National Grid Generation | — |
| Owner(s) | National Grid Generation LLC | National Grid | — |
| Status | Standby | — | — |
The West Babylon plant is a 52.4 MW petroleum-fueled power plant located in Suffolk County, New York. The plant began operating in 1971 and has one generator utilizing petroleum liquids technology. It is owned by National Grid, a company based in the United Kingdom, and operated by National Grid Generation LLC. The plant operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
In the most recent year with available data, the West Babylon plant generated 349 MWh of electricity, resulting in a capacity factor of 0.1%. The plant's installed cost was $185.18 per kW, according to FERC data. The West Babylon plant is ranked 5th out of 66 power plants in New York and 102nd out of 886 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
New York Independent System Operator
Grid Voltage
69 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
0 MWh
Latest Month
349 MWh
Annual Generation
0.1%
Capacity Factor
$0/kW
Installed Cost
$0.0/MWh
Operating Cost
National Grid Generation LLC
Reporting Utility
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Point of Interconnection
Nearest Substation
WEST BABYLON___IC
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
23714
Pricing Hub
NYISO Zone K
Node Source
EIA-860 direct report
Cuba Begins Testing First Battery Energy Storage System to Boost Grid Stability
As part of the country’s strategic program to strengthen the stability of the national grid, Cuba has begun load testing of the first unit of a battery energy storage system (BESS) at the El Cotorro substation in Havana. This is the first of four systems with a total capacity of 200 MW. According...
The Hochul-Blakeman race for governor takes shape
With Elise Stefanik, the six-term Republican member of the House of Representatives from upstate Schuylerville, deciding that she would not...
Jovan Belcher Didn't Have 'Long Concussion History,' Team Says
The death of Kansas City Chiefs linebacker Jovan Belcheris the latest in a string of bizarre NFL suicides, many of which have been blamed on concussions...
Extremist green policies have made electric rates soar
A new report issued by our Center for Cost Effective Government confirms that progressive policies implemented by New York's Legislature...
Last updated 2026-03-25
View all 10 articles