18.6 MW Jet Fuel operating in Carroll, NH — ISO New England Inc.
18.6 MW
Nameplate Capacity
1
Generators
unit
Petroleum Liquids
Technology
1968
Operating Since
Coordinates
43.8476, -71.2067
County
Carroll, NH
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Granite Shore Power | Granite Shore Power | — |
| Owner(s) | Granite Shore Power | Atlas Holdings | — |
| Status | Operating | — | — |
The White Lake power plant is located in Carroll County, New Hampshire. The plant has a total capacity of 18.6 MW and began operating in 1968. It is owned by Atlas Holdings and operated by Granite Shore Power. The plant utilizes petroleum liquids (JF) as its primary fuel source and consists of one generator. White Lake operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
In the latest year with available data, White Lake generated 484 MWh, resulting in a capacity factor of 0.3%. The plant's installed cost was $138.84 per kW, according to FERC data. White Lake is ranked as the largest of one petroleum liquid plants in New Hampshire, and second of two nationally.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
115 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
186 MWh
Latest Month
484 MWh
Annual Generation
0.3%
Capacity Factor
$144/kW
Installed Cost
$536.1/MWh
Operating Cost
Public Service Company of New Hampshire
Reporting Utility
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Point of Interconnection
Nearest Substation
White Lake Substation · 115 kV
Substation Distance
< 10 km
Operator
Eversource
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
4002 Z_NewHampshire
Pricing Hub
.Z.NEWHAMPSHIRE
Node Source
EIA-860 direct report
Winter Storm Warning: Northern Oxford; Northern Franklin; Southern Oxford; Southern Franklin; Northern Carroll; Southern C
Winter Storm Warning issued March 21 at 2:18PM EDT until March 23 at 2:00AM EDT by NWS Gray ME
Trump’s Order to Keep Michigan Coal Plant Running Has Cost $80 Million So Far
Midwestern electricity ratepayers will pay the still-mounting tab under a plan Consumers Energy reported to regulators and investors.
sylvia richards-designed lyme barn glows like a patterned lantern in new england
lyme barn by sylvia richards glows through a porous cedar facade and translucent glass banding to reinterpret agricultural architecture.
Experts tour Seabrook nuclear power plant to inspect unique concrete degradation
Nuclear power plant experts toured Seabrook Station on Thursday to see how the plant is handling degrading concrete.
Last updated 2026-03-21
View all 10 articles