117.9 MW Hydro out of service in Plumas, CA — California Independent System Operator
117.9 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1969
Operating Since
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Pacific Gas & Electric Co. | Pacific Gas and Electric Co [100%] | — |
| Owner(s) | Pacific Gas & Electric Co. | PG&E | — |
| Status | Out of service | operating | — |
The Belden hydroelectric plant is located in Plumas County, California. The plant has a total capacity of 117.9 MW and began operating in 1969. It utilizes conventional hydroelectric technology and is owned and operated by Pacific Gas & Electric (PG&E). The plant consists of one generator and uses water (WAT) as its primary fuel source. Belden ranks 34th out of 42 hydroelectric plants in California, and 160th out of 194 nationally.
In the most recent year with available data, Belden generated 243,283 MWh of electricity, resulting in a capacity factor of 23.4%. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Financial data indicates an installed cost of $1,180.84 per kW.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
230 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
43.3K MWh
Latest Month
243.3K MWh
Annual Generation
23.4%
Capacity Factor
$1,259/kW
Installed Cost
$6.8/MWh
Operating Cost
PACIFIC GAS AND ELECTRIC COMPANY
Reporting Utility
Cumulative Installed Cost
Per-Unit Cost Trends
Point of Interconnection
Nearest Substation
Bucks Creek
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
BELDEN_7_B1
Pricing Hub
TH_NP15_GEN-APND
Location Type
Pricing Node
Node Source
EIA-860 direct report
How Fault-Managed Power Cuts Labor and Material Costs in Smart Complexes
Fault-Managed Power cuts conduit and copper needs by up to 40%, reducing labor and simplifying smart-building installation.
Belden inaugurates Pune plant 2: A landmark investment in growth, safety, sustainability and enhanced soluti..
Belden Pune Plant 2: Read about Belden Inc.'s inauguration of Pune Plant 2, a significant milestone in their commitment to innovation and...
Belden inaugurates Pune plant 2: A landmark investment in growth, safety, sustainability and enhanced soluti..
Belden Pune Plant 2: Read about Belden Inc.'s inauguration of Pune Plant 2, a significant milestone in their commitment to innovation and...
Belden opens second plant in Pune with $40 million investment By Investing.com
PUNE, India - Belden Inc. (NYSE:BDC), a $4.93 billion market cap company trading near its 52-week high of $133.77, inaugurated its second...
Last updated 2026-03-14
View all 10 articles