23.3 MW Natural Gas operating in Custer, MT — Midcontinent Independent Transmission System Operator, Inc..
23.3 MW
Nameplate Capacity
1
Generators
unit
Natural Gas Fired Combustion Turbine
Technology
1972
Operating Since
Coordinates
46.4113, -105.7953
County
Custer, MT
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Montana-Dakota Utilities Co | Montana-Dakota Utilities | — |
| Owner(s) | Montana-Dakota Utilities Co | small shareholder(s) | — |
| Status | Operating | — | — |
Miles City GT is a natural gas-fired combustion turbine power plant located in Custer County, Montana. The plant has a total capacity of 23.3 MW and consists of a single generator. It began operating in 1972. The plant is operated by Montana-Dakota Utilities Co., though ownership is attributed to small shareholder(s).
The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority. In the most recent year of record, the plant generated 331 MWh of electricity, achieving a capacity factor of 0.2%. According to available data, the installed cost of the plant was $148.8 per kW. Miles City GT is ranked as the 6th largest of 7 power plants in Montana, and 1286th out of 1963 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
57 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
26 MWh
Latest Month
331 MWh
Annual Generation
0.2%
Capacity Factor
$221/kW
Installed Cost
$395.2/MWh
Operating Cost
MDU Resources Group, Inc.
Reporting Utility
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Market Position
ISO/RTO Market
MISO
LMP Node
MDU.MCTURB1
Pricing Hub
MINN.HUB
Location Type
Generation Node
Node Source
EIA-860 direct report
Electric gridlock: Can the growing West's infrastructure evolve fast enough to keep the lights on?
The electric grid — more than half a million miles of high-voltage transmission lines strung across the nation — is under growing pressure...
A Twist of Le Mans: Testing the Ferrari Enzo Against the Porsche Carrera GT and Ford GT
We take three race-bred, no-compromises sizzlemobiles, the Ferrari Enzo, Porsche Carrera GT, and Ford GT, and test them to their top speed...
Coal-Fired Power Plant Will Gain New Life With Green Hydrogen
The new units at the Intermountain Power Project will be able to operate using a mix of hydrogen and natural gas, with a goal to use green hydrogen exclusively...
Largest US gas-fired power plant planned for data centers in Pennsylvania
The 4.5-GW, $10 billion project at the former Homer City coal-fired power plant could start operating by 2027, according to the project's developers.