3.6 MW Hydro out of service in Hampden, MA — ISO New England Inc.
3.6 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1926
Operating Since
Coordinates
42.1760, -72.4095
County
Hampden, MA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Central Rivers Power MA, LLC | — | — |
| Owner(s) | Central Rivers Power MA, LLC | — | — |
| Status | Out of service | — | — |
Red Bridge Hydro is a hydroelectric power plant located on the Chicopee River in the towns of Wilbraham, Ludlow, Palmer, and Belchertown, Massachusetts. It was constructed in 1901 and is currently owned by Central Rivers Power LLC and is operated by Patriot Hydro, an affiliate of LS Power.
Read more on WikipediaThe Redbridge power plant, located in Hampden County, Massachusetts, is a 3.6 MW hydroelectric facility. It began operating in 1926 and utilizes conventional hydroelectric technology. The plant has two generators and is owned and operated by Central Rivers Power MA, LLC. Its primary fuel source is water (WAT).
Redbridge operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. It ranks as the 17th largest power plant out of 31 in Massachusetts, and nationally it is ranked 1003 out of 1464 plants.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
13.8 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Ludlow Substation · 345 kV
Substation Distance
< 10 km
Operator
Eversource
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
874
Pricing Hub
.H.INTERNAL_HUB
Node Source
EIA-860 direct report