61.8 MW Hydro operating in Franklin, MA — ISO New England Inc.
61.8 MW
Nameplate Capacity
6
Generators
units
Conventional Hydroelectric
Technology
1915
Operating Since
Coordinates
42.5876, -72.5792
County
Franklin, MA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | FirstLight Power Resources, Inc. - MA | Firstlight Power Resources | — |
| Owner(s) | FirstLight Power Resources, Inc. - MA | ENGIE | — |
| Status | Operating | operating | — |
The Cabot hydroelectric plant, located in Franklin County, Massachusetts, has a total capacity of 61.8 MW. The plant began operating in 1915 and utilizes conventional hydroelectric technology. It consists of 6 generators and is owned by ENGIE, a company based in France. FirstLight Power Resources, Inc. - MA is the listed operator per EIA data.
In the most recent year with available data, the plant generated 304,242 MWh, achieving a capacity factor of 56.0%. Cabot operates within the ISO New England Inc. balancing authority and the NPCC NERC region. It is the 3rd largest hydroelectric plant in Massachusetts out of 31 such plants, and ranks 268th nationally out of 1464 hydroelectric plants.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
115 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
29.0K MWh
Latest Month
304.2K MWh
Annual Generation
56.0%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Montague/Cabot Substation · 115 kV
Substation Distance
< 10 km
Operator
Eversource
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
N.MONTAGUE13.8 CABT
Pricing Hub
.H.INTERNAL_HUB
Node Source
EIA-860 direct report
3 Stocks for the Energy Transmission Crisis
Little covered in the headlines about infrastructure is the massive need to solve the energy transmission crisis; these 3 stocks are set to...
Taunton extends hydroelectric power contract with FirstLight
Taunton Municipal Lighting Plant has extended its agreement to buy hydroelectric power from FirstLight, a move that will help the utility...
FirstLight and Energy New England extend hydropower supply agreement to 2040
The expanded contract will supply 197GWh of electricity annually from two long-operating hydroelectric plants in Massachusetts, US.
Worried about prices, pushback, Westfield G&E locks in Conn. River hydro through 2040
The new power buying agreement will extend 16 more years providing enough energy to support the year-round power demands of approximately...
Last updated 2026-03-26
View all 10 articles