4.4 MW Distillate Oil operating in Mercer, PA — PJM Interconnection, LLC
4.4 MW
Nameplate Capacity
1
Generators
unit
Petroleum Liquids
Technology
1984
Operating Since
Coordinates
41.1694, -80.1055
County
Mercer, PA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | General Electric Co | General Electric | — |
| Owner(s) | General Electric Co | General Electric | — |
| Status | Operating | — | — |
The Wabtec U.S Rail, Grove City Engine Plant is a 4.4 MW diesel-fueled power plant located in Mercer County, Pennsylvania. The plant began operating in 1984 and has one generator utilizing petroleum liquids technology. It is owned and operated by General Electric Co, a subsidiary of General Electric.
In the most recent year of data, the plant generated 4,819 MWh of electricity, achieving a capacity factor of 12.5%. The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. It is ranked as the 27th largest of 31 petroleum-fueled plants in Pennsylvania, and 576th of 886 similar plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
12 kV
Regulatory Status
NR
Entity Type
Industrial
Sector
Industrial Non-CHP
127 MWh
Latest Month
4.8K MWh
Annual Generation
12.5%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
PJM
LMP Node
GROVECTY69 KV T1
Pricing Hub
WESTERN HUB
Location Type
Load Node
Node Source
Curated node match
Utility Portland General Electric finalises agreements for 1GW renewables and BESS
Portland General Electric (PGE) has finalised agreements for more than 1000MW of new renewable energy and BESS projects in Oregon,US.
PGE wants to add solar to troubled wind farm instead of replacing turbines
The turbines at Portland General Electric's Biglow Canyon wind farm have experienced continuing maintenance issues in recent years,...
PGE wants to add solar to troubled wind farm instead of replacing turbines
The turbines at Portland General Electric's Biglow Canyon wind farm have experienced continuing maintenance issues in recent years,...
Upcoming investigation: How an airborne blade exposed broader problems at PGE’s flagship wind farm
A Vestas turbine launched a blade at Portland General Electric's Biglow Canyon wind farm Feb. 1. The seven-ton blade landed along with a shower of bolts in a...
Last updated 2026-03-26
View all 6 articles